箱式双向调压塔布设位置对水锤的影响
Effect of placement locations of box-type bidirectional surge tanks on water hammer

秦若琪,史玮,徐一丁
Qin Ruoqi,Shi Wei,Xu Yiding

摘要(Abstract):

针对长距离输水管道水锤现象易引发管道破裂的工程问题,结合实际跨流域调水支线工程实例,探讨箱式双向调压塔布设位置对管道压力波动的控制效果。依托特征线法构建水力瞬态数值模型,对比仅前段布设、前段-中段联合布设、前-中-末三段联合布设3种调压方案。结果表明,仅前段布设调压塔时,管道压力超限长度26 560 m,超限占比83%,最大水锤压力峰值达2.551 MPa;前段与中段联合布设时,压力超限长度24 560 m,超限占比76.7%,仍存在大范围压力超标,水锤风险无法得到有效控制;采用前、中、末三段联合布置箱式双向调压塔方案,全管线最大水锤压力由2.551 MPa降至0.736 MPa以内,可快速响应瞬态压力变化,显著抑制水锤升压,使31.44 km全管段压力全部控制在1.0 MPa设计承压范围内,管道压力达标覆盖率达到100%。调压塔与水锤发生点近距离匹配布置可充分发挥动态稳压效能,防护效果最优。工程实际运行至今未发生由水锤造成的设备损坏与安全事故。研究成果可为长距离输水工程水锤防护设计与调压设施优化布局提供参考。
Addressing the engineering issue of pipeline rupture caused by water hammer in long-distance water conveyance pipelines, based on a practical case of an inter-basin water transfer branch project,explores the control effect of the placement location of box-type bidirectional surge tanks on pipeline pressure fluctuations. Utilizing the characteristic line method,a hydraulic transient numerical model is constructed to compare three surge regulation schemes:only front-section deployment,combined front-section and middle-section deployment,and combined front, middle, and end-section deployment. The results indicate that when only the front-section surge tank is deployed, the pipeline pressure exceeds the limit for a length of 26 560 m, accounting for 83% of the total length, with a maximum water hammer pressure peak reaching 2.551 MPa. When the front-section and middle-section surge tanks are jointly deployed,the pressure exceeds the limit for a length of 24 560 m,accounting for 76.7% of the total length, still resulting in widespread pressure exceedances and ineffective control of water hammer risks.By adopting the scheme of jointly deploying box-type bidirectional surge tanks in the front, middle, and end sections,the maximum water hammer pressure along the entire pipeline is reduced from 2.551 MPa to within 0.736 MPa.This arrangement allows for rapid response to transient pressure changes,significantly suppresses water hammer pressure rise,and ensures that the pressure of the entire 31.44 km pipeline section is controlled within the design pressure range of 1.0 MPa,with a pressure compliance coverage rate of 100%.The close proximity of the surge tanks to the water hammer occurrence points maximizes their dynamic pressure stabilization efficiency, achieving optimal protection effects.Since its actual operation, the project has not experienced any equipment damage or safety accidents caused by water hammer.The research findings provide valuable insights for the design of water hammer protection and the optimal layout of surge regulation facilities in long-distance water conveyance projects.

关键词(KeyWords): 水锤;箱式双向调压塔;布置位置
water hammer;box-type bidirectional surge tank;placement location