城市蒸汽管网系统动态风险评估技术New Safety Operation Technology for Urban Steam Pipe Network System
张增刚,李继志,李永安
ZHANG Zeng-gang~1,LI Ji-zhi~1,LI Yong-an~2 (1.University of Petroleum
摘要(Abstract):
介绍了国内外动态风险分析技术的发展状况;分析了动态风险评估在城市蒸汽管网系统的作用。并对城市蒸汽管网系统风险模型及其系统的构建进行了分析;探讨发展动态风险分析技术所需要解决的关键技术问题。对我国在城市蒸汽管网系统中风险评估技术的应用提出了建议。
The dynamic risk model of urban steam pipe network system and its software system are analysed based on the development of dynamic risk analysis technology at home and abroad.Some key problems about dynamic risk analysis technology are discussed.Suggestions on developing risk-based application in urban steam pipe network system in China are proposed.
关键词(KeyWords):
城市蒸汽管网;动态风险分析;概率安全评估;风险模型
urban steam pipe network system;dynamic risk analysis;probabilistic safety assessment;risk model
基金项目(Foundation): 山东省教委科技开发计划项目(J04D12)
作者(Author):
张增刚,李继志,李永安
ZHANG Zeng-gang~1,LI Ji-zhi~1,LI Yong-an~2 (1.University of Petroleum
参考文献(References):
- [1]Campbell D J.User’s Guide for PRISIM A T ArkansasNuclear One-Unit 1[M].Volume 1:Program for In-spectors.NUREG/CR25021,Jan,1988.
- [2]Gordon R.Moir On-line Use of PSA for Risk-BasedConfiguration Control,IAEA Technical[A].CommitteeMeeting on“Procedures for Use of PSA for OptimizingNPP Operational Limit s and Conditions”[C].Barcelona,Spain,Sep,1993.
- [3]Probabilistic Risk A ssessment of the Space Shuttle,AStudy of the Potent ial of Losing the Vehicle During Nom-inal Operat ion[R].(NASA 2CR2197808).New York:Science Application International Corporation,AdvancedTechnology Division.28 February,1995.
- [4]Hazard Analysis and Safety Risk Assessment Methods andProcedures(ESA PSS2012403)[R].1994.ESA;
- [5]Samanta P K,Kim I S.Handbook of Methods for Risk-Based Analyses of Technical Specifications[M].NUREG/CR26141,Dec.1994.
- [6]Xue Dazhi,Xu Yaowu.The modeling approach for a real-time risk management system[A].International Confer-ence on“Probabilistic Safet y Assessment Met hodologyand Applications”[C].PSA’95,Seoul,Korea,Nov.26230,1995.
- [7]田贯三,张增刚,江亿.城镇天然气管网水力分析数学模型与计算方法[J].天然气工业,2002,22(3):96-98.
- [8]周方勤.对长输天然气管线进行风险性评价的初探[J].天然气工业,1997,17(1):60-63.
- [9]张艳丽.工程风险评价方法的研究[D].南京:南京工业大学化工机械研究所,2002.
- 城市蒸汽管网
- 动态风险分析
- 概率安全评估
- 风险模型
urban steam pipe network system - dynamic risk analysis
- probabilistic safety assessment
- risk model